This family had an extension to the upstairs of their property, creating a brand new master bedroom which needed an ensuite, and enlarging the existing master bathroom.



I installed all the plumbing work, including re-routing all the under floor pipework, and also did all the tiling and boxing in. the client painted the walls themselves.

Ensuite had a toilet, shower, small sink and towel rail. Shower cubicle and floor were tiled by me too.